Trains speeds at 130 Kmph in major sections of SCR Zone achieved
Hyderabad: South Central Railway (SCR) Zone has reached one more milestone by increasing the maximum permissible speed of train services to 130 kmph in the majority sections of Secunderabad, Vijayawada and Guntakal Divisions.
This has been achieved by the Zone with the systematic and planned approach in strengthening of track & its infrastructure by removing bottlenecks in these sections at a fast pace, a SCR statement here said on Sunday.
These infrastructure development works, maintenance works and signaling aspects were carried out continuously after the due sanction accorded by RDSO/Lucknow in the year 2020.
After carrying out extensive upgradation works in these sections, it has now been permitted to increase the sectional speed of train services from 110 kmph to 130 Kmph on both Up & Down lines of these sections with effect from September 12.
The sections that are covered under this speed implementation concept are – Secunderabad – Kazipet – Balharshah, Kazipet – Kondapalli sections in Secunderabad Division, Kondapalli – Vijayawada – Gudur of Vijayawada Division, Renigunta – Guntakal – Wadi of Guntakal Division. These sections cover the entire High-Density Route, Golden Quadrilateral and Golden Diagonal routes of SCR, except for the section between Vijayawada – Duvvada of Golden Diagonal route, where the works are in fast progress for implementation of increased speed.
The enhancement of maximum permissible speed in these sections is likely to result in the improvement of average speed of the both Passenger-carrying trains as well as Goods trains, the statement added. (UNI)
Comments are closed.